Our Stock
- Home
- Our Stock
BMW 1 Series 1.5 118i GPF M Sport Shadow Edition Hatchback 5dr Petrol Auto Euro 6 (s/s) (136 ps)
£13,999.00
Reserve Part Exchange Test Drive
Introducing the BMW 1 Series 1.5 118i GPF M Sport Shadow Edition Hatchback – a stunning blend of performance, luxury, and cutting-edge technology that promises to elevate your driving experience to new heights! With its striking Estoril Blue exterior, this hatchback is not just a car; it’s a statement on wheels. Boasting a powerful 1.5-litre engine that delivers an exhilarating 134 bhp, you’ll find yourself accelerating from 0 to 62 mph in just 8.7 seconds, reaching a top speed of 130 mph. With a rear-wheel-drive setup and automatic transmission, every journey becomes a thrilling adventure, whether you’re navigating city streets or cruising on the motorway.
Step inside, and you’ll be enveloped in the luxurious embrace of Dakota Leather in Black with Blue Highlights. This exquisite upholstery not only enhances the aesthetic appeal of the interior but also provides unparalleled comfort for both the driver and passengers. The striking blue highlights add a touch of sportiness, perfectly complementing the dynamic character of the BMW 1 Series. You’ll feel like royalty every time you slide into the driver’s seat, ready to conquer the road ahead.
The interior trim, featuring Aluminium Hexagon with a Black High Gloss Finisher, elevates the cabin’s sophistication to another level. This sleek and modern design element not only looks fantastic but also enhances the overall driving experience. The high gloss finish reflects light beautifully, creating an inviting atmosphere that makes every journey enjoyable. It’s the perfect blend of style and functionality, ensuring that you travel in both comfort and elegance.
On chilly mornings or during those brisk evening drives, the seat heating for the driver and front passenger will be your best friend. Imagine sinking into the warmth of your seat as you embark on your daily commute or weekend getaway. This thoughtful feature adds an extra layer of comfort, making every drive a pleasure, regardless of the weather outside.
With a mileage of just 53,000 miles and a long MOT, this BMW 1 Series is ready to hit the road with you. It’s ULEZ compliant, ensuring you can drive with peace of mind in urban areas, while the annual road tax is a reasonable £200. Plus, with a cheap insurance group rating of 20, you can enjoy the thrill of driving a premium vehicle without breaking the bank.
Don’t miss out on the opportunity to own this exceptional BMW 1 Series 1.5 118i GPF M Sport Shadow Edition Hatchback. Get in touch with us today to arrange a viewing or to find out more about this incredible vehicle! Your dream car awaits!
| Year: | 2019 |
| Mileage: | 53,000 miles |
| Body Type: | Hatchback |
| Color: | Blue |
| Fuel Type: | Petrol |
| Transmission: | Automatic |
| Drivetrain: | Rear Wheel Drive |
| Doors: | 5 |
| Seats: | 5 |
Standard Features
- Audio and Communications
- 12V Power Socket - Centre Console
- 12V Power Socket - Passenger Footwell
- BMW ConnectedDrive Online Services
- BMW ConnectedDrive Services
- BMW Emergency Call
- BMW Navigation System
- BMW Professional Radio - Single CD and MP3
- BMW TeleServices
- Bluetooth Hands Free with USB Audio Interface
- DAB Digital Radio
- Loudspeaker System - Harman Kardon
- Real Time Traffic Information
- Rear Window Aerial
- Remote Services
- Shark Fin
- Exterior
- 18in Alloy Wheels - M Double Spoke - 719M Bicolour Jet Black
- BMW Mobility Tyre Sealing System
- Black High-Gloss Kidney Grille Frame with Black Slats
- Direction Indicator - Side Repeaters - Integrated in Exterior Mirrors
- Direction Indicator Lights - Clear Lenses
- Electric Windows - Front and Rear with Open-Close Fingertip Control - Anti-Trap Facility and Comfort Closing Function
- Exhaust Tailpipes - Dark Chrome
- Exterior Mirrors Electrically Adjustable
- Exterior Parts in Body Colour
- Exterior Trim - High Gloss Shadowline
- Heat Protection Glazing with Green Tint
- LED Headlights with Darkened Surround
- Locking Wheel Bolts
- M Aerodynamic Bodystyling
- M Logo Designation Chrome - Side
- Rear Fog Light - Offside
- Reversing Light in Rear Cluster - Nearside
- Run Flat Tyres
- Sun Protection Glazing
- Tyres - Reduced Rolling Resistance
- Safety and Security
- Active Differential Brake - ADB Sport - Electronic Differential Lock in DSC-Off Mode
- Airbags
- Alarm System - Thatcham 1 with Remote Control and Engine Immobiliser
- Battery Safety Cut Off
- Bumper System Front and Rear - Replaceable Deformation Elements for Impacts Up to 9mph
- Child Proof Locking System - Rear Doors
- Child Seat ISOFIX Attachment for the Two Outer Rear Seats
- Crash Sensor - Activating Central Locking Release - Hazard Warning Lights - Battery Safety Cut Off - Interior Lighting
- DSC - Dynamic Stability Control Plus
- Dynamic Brake Lights
- First Aid Kit and Warning Triangle
- Remote Control Including Integrated Key - 2
- Remote Control with Integrated Key with Insert in Blue
- Seat Belt Security Check for Driver and Front Passenger
- Side Impact Protection
- Speed Limit Function
- Three-Point Seat Belts - All Seats
- Visible VIN
- Windscreen Wiper - Rear
- Interior
- Air Conditioning - Automatic - Single Zone
- Ambient Lighting - Switchable BMW Classic Orange - Cold White - LED
- Armrest - Front with Sliding Adjustment
- Automatically Dimming Rear View Mirror
- Central Locking Switch - Doors - Fuel Filler Cap - Luggage Compartment
- Cupholders Two with Sliding Cover and Inlay Mat
- Door Sill Finishers - M Designation
- Extended Lighting
- Extended Storage
- Floor Mats - Velour
- Glove Compartment
- Glovebox - Handle with Chrome Surround
- Grab Handles - Integrated in Roof Linings - Four
- Handbrake and Gear Knob - Leather
- Head Restraints - Rear and Folding
- Headlining - Anthracite
- Instrument Cluster
- Interior Lighting - Front Centre Over Interior Mirror and Rear Centre
- Interior Trim - Aluminium Hexagon with Estoril Blue Finisher
- Lashing Eyes in Luggage Compartment at Sill x2
- Luggage Compartment - Light
- Luggage Compartment Access via BMW Roundel
- Multifunction Controls for Steering Wheel
- Non Smokers Package
- Personal Profile
- Rain Sensor with Automatic Headlight Activation
- Seats - 60-40 Split Folding Rear
- Side Armrests - Front and Rear Integrated into Door Trim
- Sport Seats - Front
- Start-Stop Button with Comfort Go Keyless Engine Start and Auto Start-Stop Deactivation Button
- Steering Wheel - M Sport Leather Multifunction
- Steering-Wheel Column Adjustment - Manual
- Storage Compartment - Rear Centre Console and in Door Trim - Front
- Sun Visors with Vanity Mirrors and Ticket Holder
- Twin Horns
- Welcome Lighting - LED
- Drivers Assistance
- Battery Age Recognition Function
- Brake Pad Wear Indicator - Front and Rear
- Condition Based Service
- Cruise Control with Brake Function
- Drive Performance Control - ECO PRO - Comfort - Sport - Sport Plus Modes
- ECO PRO Mode
- OBC - On-Board Computer
- Oil Temperature Display via On-Board Computer Shown in Central Screen in Instrument Cluster
- Optimum Shift Indicator
- PDC - Park Distance Control - Rear
- TPMS - Tyre Pressure Monitoring System
- Illumination
- Check Control Warning System for Monitoring of Lights and Door-Luggage Compartment Open Warning
- Darkened Rear Lights with LED Light Bars
- High Level Third Brake Light
- LED Fog Lights - Front
- LED Headlights
- Lights-On Warning by Audio Warning Signal When Ignition is Switched Off
- Performance
- EPS - Electric Power Steering
- M Sport Braking System
- M Sport Suspension
- Servotronic Steering
Optional Extras
- Upholstery
- Dakota Leather - Black with Blue Highlights with Black Interior
- Paint
- Estoril Blue
- Interior
- Interior Trim - Aluminium Hexagon with Black High Gloss Finisher
- Seat Heating for Driver and Front Passenger
Related Vehicles
- MINI Hatch 1.5 Cooper Sport Hatchback 3dr Petrol Manual Euro 6 (s/s) (136 ps)
- Honda Jazz 1.3 i-VTEC SE Navi Hatchback 5dr Petrol CVT Euro 6 (s/s) (102 ps)
- Mercedes-Benz E Class 3.0 E400 V6 AMG Line (Premium Plus) Coupe 2dr Petrol G-Tronic+ 4MATIC Euro 6 (s/s) (333 ps)
- Vauxhall Mokka 1.6i Exclusiv SUV 5dr Petrol Manual 2WD Euro 6 (s/s) (115 ps)

































